| Age | Commit message (Expand) | Author |
|---|---|---|
| 3 hours | Remove obsolete branch status and upgrade documentationHEADmain | Doan Luu Duc Tai |
| 7 hours | Remove retired chat placeholder and stale deployment documentation | Doan Luu Duc Tai |
| 9 hours | Show crypto download progress and centralize license links | Doan Luu Duc Tai |
| 9 hours | Package private chat for HTTPS and verify portable encrypted recovery | Doan Luu Duc Tai |
| 18 hours | Centralize deployment settings in the root environment file | Doan Luu Duc Tai |
| 24 hours | Render the license page in cgit and stack the site footer links | Doan Luu Duc Tai |
| 25 hours | Remove the completed migration helper and document private downloads | Doan Luu Duc Tai |
| 27 hours | Manage the portable stack with Rust and rootless Podman | Doan Luu Duc Tai |
